A brief history 

A number of projects required a wall tie solution across the Mancheter region including phase one 257 properties and phase two 148 properties in Burnage for main contractor Bramhall Construction and a further 420 properties in Leinshulme for main contractor Henry Boot.


House front during restoration work

The problem 

The terraced and semi-detached properties were in need of replacement cavity wall ties due to the age of the properties. The original wall ties had corroded within the cavity wall and needed to be replaced as part of the housing renewal scheme.


Installing Thor Helical Drive Tie using the Drive Tie Tool and an SDS drill

The solution 

Remedial Restoration chose the Thor Drive Fix Tie as the replacement wall tie of choice for the project. The Thor Drive Fix Tie gave a quick and easy solution to the scheme. The Thor Drive Fix Tie allows quick installation and the advantage of smaller diameter drilling sizes which gives less visual damage to the brickwork.  In all over 120,000 wall ties were installed during the schemes.

Thor Helical Remedial gave regular onsite guidance and support right through the project including meeting with the main contractor and carrying out routine testing for the local authorities involved in the projects.


Testing the installed Thor Helical Drive Ties



Apply to become an approved installer


Find an approved installer


Product Enquiry


Interactive masonry repairs

Riba Product Selector
RIBA CPD Providers Network.gif
The Association of Building Engineers
Wykamol Group. Thor Helical Remedial is part of Wykamol group
Page updated 10th May 2010, 09:54
BRICK | instant websites

© 2018 Wykamol Group. All rights reserved.

Page updated 10th May 2010, 09:54

Designed and maintained by Brick technology Ltd.
BRICK | Instant Websites