The Problem
Subsidence had occurred at the corner of the building as a result of a defective drain which had caused leakage to the underside of the foundation. Also, attributable to the buildings movement at this point was the use of inadequate and unconsolidated fill material. |
|
.jpg)
Test marks at 100mm intervals to facilitate the timing of pile drive speeds. |